[00:01.080] |
--- Lesson 64 The Channel Tunnel |
[00:06.640] |
--- First listen and then answer the question. |
[00:12.600] |
--- Why was the first tunnel not completed? |
[00:18.440] |
In 1858, a French engineer, Aime Thome de Gamond, arrived in England with a plan for a twenty-one-mile tunnel under the English Channel. |
[00:35.040] |
He said that it would be possible to build a platform in the centre of the Channel. |
[00:40.880] |
This platform would serve as a port and a railway station. |
[00:46.160] |
The tunnel would be well-ventilated if tall chimneys were built above sea level. |
[00:53.400] |
In 1860, a better plan was put forward by an Englishman, William Low. |
[01:01.000] |
He suggested that a double railway-tunnel should be built. |
[01:05.640] |
This would solve the problem of ventilation, for if a train entered this tunnel, it would draw in fresh air behind it. |
[01:15.320] |
Forty-two years later a tunnel was actually begun |
[01:20.320] |
If, at the time, the British had not feared invasion, it would have been completed. |
[01:27.080] |
The world had to wait almost another 100 years for the Channel Tunnel. |
[01:33.480] |
It was officially opened on March 7,1994, finally connecting Britain to the European continent. |
[01:44.040] |
--- end |